Street Improvement Program

Contact our Department

2024 Infrastructure Projects

The Township’s 2024 Street Improvements focus primarily on residential areas and are comprised of two phases. The first phase of work includes concrete curb and sidewalk repair. Construction on curbs and sidewalks will begin in the spring on the following streets:

Ash Hollow

Pheasantwood

Wood Bluff

Timberwyck

Trail Stone

Green Timber

Timber Brook

Glenwyck

Woodledge

Waterwyck

Meadow Haven

Woodwyck

Goodfield

Quail Run

Chess Wood

Tanglewyck

Quailwood

Cedar Creek East

Bridlewood

Eastpoint

Nighthawk

Sycamore Creek

Timberhawk

Walnut Creek

Hidden Oaks

Winter Hill

Wood Mill

Agne

Wardmier

Roamont

Malabar

Lindenhurst

Resinda

Penbrooke

Falkmore

Beaushire

Southpoint

Agate

Gem

Beryl

Turquoise

Jade

Onyx

 

The second phase of the Street Improvements include asphalt milling and paving. This work is performed later in the summer and will encompass a total of 48 streets for the 2024 season. The full list of streets will be on the Township website and social media pages in early May.

Streets that are within the program are determined through a Pavement Condition Index. When inspecting pavement, Public Works looks at the surface and edge for cracking and distress, reviews the ride, and rates the overall structure of each street. They also assess curb, sidewalk, and storm pipe and drainage which can impact the asphalt, as well as overall project costs. Finally, they assess neighboring streets and the level of traffic in the neighborhood. These observations determine when each road is scheduled for resurfacing. Once all pavement inspection is complete, the department uses that information to forecast future infrastructure projects.