The Township’s 2024 Street Improvements focus primarily on residential areas and are comprised of two phases. The first phase of work includes concrete curb and sidewalk repair. Construction on curbs and sidewalks will begin in the spring on the following streets:
Ash Hollow
|
Pheasantwood
|
Wood Bluff
|
Timberwyck
|
Trail Stone
|
Green Timber
|
Timber Brook
|
Glenwyck
|
Woodledge
|
Waterwyck
|
Meadow Haven
|
Woodwyck
|
Goodfield
|
Quail Run
|
Chess Wood
|
Tanglewyck
|
Quailwood
|
Cedar Creek East
|
Bridlewood
|
Eastpoint
|
Nighthawk
|
Sycamore Creek
|
Timberhawk
|
Walnut Creek
|
Hidden Oaks
|
Winter Hill
|
Wood Mill
|
Agne
|
Wardmier
|
Roamont
|
Malabar
|
Lindenhurst
|
Resinda
|
Penbrooke
|
Falkmore
|
Beaushire
|
Southpoint
|
Agate
|
Gem
|
Beryl
|
Turquoise
|
Jade
|
Onyx
|
|
The second phase of the Street Improvements include asphalt milling and paving. This work is performed later in the summer and will encompass a total of 48 streets for the 2024 season. The full list of streets will be on the Township website and social media pages in early May.
Streets that are within the program are determined through a Pavement Condition Index. When inspecting pavement, Public Works looks at the surface and edge for cracking and distress, reviews the ride, and rates the overall structure of each street. They also assess curb, sidewalk, and storm pipe and drainage which can impact the asphalt, as well as overall project costs. Finally, they assess neighboring streets and the level of traffic in the neighborhood. These observations determine when each road is scheduled for resurfacing. Once all pavement inspection is complete, the department uses that information to forecast future infrastructure projects.